Monday 25 March 2013

March 26th 2013

A lot has happened since the last blog posting. Plastering, painting, skirting board, kitchen installed, lights and electrical sockets and we're now working on the bathroom.
 It took 7 full days to plaster the 4 rooms and landing. They did a great job.
 The floor tiles for the kitchen.
 Kitchen carcassing is positioned.
 Loads of lighting and switches.
 Joc gets the tiling in the kitchen done.
 Skirting goes on.
 Built in fridge/freezer.
 Hidden washing machine,
 Loads of sockets.
 Bedroom gets painted and skirting goes on.
Kitchen electrics and lighting sorted.
 
 Now we're working on the bathroom.