Monday 3 December 2012

December 3rd

Wires, wires, wires...

Think I must have threaded around 600m of electrical cable of some description over the last week or so: 3x 2.5mm ring mains, 2x 1.5mm lighting circuits, satellite cable to 3 rooms, cat6 ethernet to two rooms, earth bonding cable, telephone cable, 6mm cooker cable, thermostat cables ...

All looking neat and tidy between the joists. 

Sparks Paul wired up the tails to the new consumer board. 

No holes allowed in the membrane so cable is taped on

And now the plasterboard can go on... signs of progress