Wednesday, 15 August 2012

August 15th

Now the new floor is in above the lounge....


 .... we've been getting the ground floor sorted. Soil pipe for bathroom needs to go under here. Dave was visiting and got roped into some demolition (think he even enjoyed it). We ripped out the old suspended floor and hired a concrete breaker to get the old kitchen floor up. Dave atacked the wall to make a doorway between the lounge and extension (kitchen/diner)

 Half way there

He's through! 

 Joc attacks the dividing wall foundations

 Ddddrrrrrillllllinnnnggggg.

Soil pipe bedded in the protective pea gravel

 The 'new' way into the kitchen/diner

Floor all level, waiting for the sand, dpm and concrete